Factors Influencing Performance of Construction Procurement Contracts at Kenya Ports Authority, Mombasa County, Kenya

Authors

  • Ian Maxwell Suero Jomo Kenyatta University of Agriculture and Technology
  • G. Kipkorir Ng'eny Jomo Kenyatta University of Agriculture and Technology

Keywords:

Procurement Ethical Practices, Procurement Contract Administration, Procurement Contractor Selection, Construction Procurement Contracts, Kenya Ports Authority.

Abstract

Construction procurement contracts have been a subject of passionate debate among taxpayers in Kenya. Many of them feel there is a lot of wastages and corruption in public construction projects. Reports published by the Auditor General reveal that, construction procurement contracts in most cases are discharged by breach as opposed to by performance. This study, therefore, sought to examine the factors that influence performance of construction procurement contracts in the public sector. The objectives of the study were; to assess the influence of procurement ethical practice, procurement contract administration, procurement contractor selection, and procurement planning on the performance of construction procurement contracts at KPA. Four theories have been applied in this study. These include, The Normative Ethics theory, the Stakeholder theory, the Transactional theory and the Planning theory. Each of these theories explains the relevance of the independent variables. The target population comprised four divisions of Kenya Ports Authority; namely the internal audit, legal, finance and infrastructure. The sampling technique used was stratified sampling. The sample size was 75 employees. Data collection instruments used was questionnaires. Statistical Package for Social Sciences was used to analyze the data. The statistical tests that were employed include Pearson correlation, ANOVA and multiple linear regression. Out of the 75 questionnaires which were disseminated, 54 were filled and returned. This   represented   a response rate of 72% .The data analysis revealed that there was a correlation between the dependent and independent variables. The multiple regression output, presented an R square value of 0.813. The Analysis of Variance revealed a p value of less than 0.05 which confirmed that the statistical test was significant and therefore the null hypothesis was rejected in favour of the alternative hypothesis. The multiple regression analysis revealed that all the independent variables had a p value of less than 0.05. This study therefore concluded that, there was a positive linear relationship between construction procurement contracts and procurement ethical practices, procurement contract administration, procurement contractor selection and procurement planning. The study recommended Kenya Ports Authority to, practice procurement ethics throughout the procurement cycle, undertake procurement contract administration, employ procurement contractor selection before award and ensure procurement plans are prepared as prescribed by law before tender advertisement.

Keywords: Procurement Ethical Practices, Procurement Contract Administration, Procurement Contractor Selection, Construction Procurement Contracts, Kenya Ports Authority.

Author Biographies

Ian Maxwell Suero, Jomo Kenyatta University of Agriculture and Technology

Postgraduate Student

G. Kipkorir Ng'eny, Jomo Kenyatta University of Agriculture and Technology

Lecturer

 

References

Auditor General, (2013). Report of the Auditor General on the Appropriation Accounts for the Year: 2012/2013. Nairobi: Office of Auditor General.

Auditor General, (2015). Report of the Auditor General on the Financial Statement for the National Government for the year 2014/2015. Nairobi: Office of Auditor General.

BIFM. (2015). Ethical Procurement and Supply. London: British Institute of Facilities Management.

Blackwell, W. (2016). Readings in Planning Theory. London: Blackwell Publishers Ltd.

Cooper, D, and Schindler, P. (2013). Business Research Methods. New York: McGraw Hill.

Cummins, S. (2016). Black White and Gray: Law & Ethics in Business. Stanford: Cengage Learning Publishers.

Duxbury, R. (2015). Contract Law. London: Sweet & Maxwell.

Engelbert, A. (2017). Public Procurement Law in Sub Saharan Africa. Cham: Springer Nature.

FIDIC. (2010). Conditions of Contract for Construction. Geneva: FIDIC.

Hartley, J. L., & Choi, T. Y. (2013). Supplier development: customers as a catalyst of process change. Business Horizons, 39(4), 37-44.

Hinze, J. (2011). Construction Contracts. New York: McGraw Hill Publishers.

Jennings, M. (2015). Business Ethics. Stanford: Cengage Learning Publishers.

Jorge, A. & Lynch, T. (2017). Procurement Planning Basics. Manila: Good Governance Book Publishers.

Kagendo, N. M. (2010). Effects of public procurement and disposal act on procurement in parastatals in Kenya (Dissertation from University of Nairobi).

Kiage, J. O. (2013). Factors affecting procurement performance: A case of ministry of energy. International journal of business and commerce, 3(1), 54-70.

KNBS (2017). Economic Survey 2017. Nairobi: Government Press.

Kothari, C.R. & Garg, G. (2014). Research Methodology, Methods & Technique. New Delhi: New Age International Publishers.

KPA. (2015). Kenya Ports Authority Business Plan. Nairobi: Government Press.

Mathenge, G. D. (2012). Responsible purchasing and supply chain management in Kenya: A critical analysis of the ethical considerations in Procurement management. European Journal of Business and Management, 4(3), 20-12.

Krause, D. R. (2015). The antecedents of buying firms' efforts to improve suppliers. Journal of operations management, 17(2), 205-224.

Lamming, R. (2014). Squaring lean supply with supply chain management. International Journal of Operations & Production Management, 16(2), 183-196.

Miles, S. (2012). Stakeholder: essentially contested or just confused? Journal of Business Ethics, 108(3), 285-298.

Mugenda, A. & Mugenda, B. (2008). Research Methods Qualitative & Quantitative Approach. Nairobi: ACT Press.

OECD. (2017). Public Procurement for Innovation, Good Practices and Strategies. Paris: OECD Publishing.

Okinyi, T. O., & Muturi, W. (2016). Factors affecting efficiency of procurement in public institutions: a case of public entities in Homabay County. Int. J. Social Sci. Inf. Technol., 2(2), 1-14.

PPOA. (2009). Procurement Reforms in Kenya. Journal of Purchasing, 3-18.

RoK. (2016). Public Procurement and Asset Disposal Draft Regulations. Nairobi: Government Press.

RoK. (2015). Public Procurement and Asset Disposal Act. Nairobi: Government Press.

Sabiiti, C.K, Muhumuza, E. & Tumutegyereize M. (2013). Performance of the Public Procurement and Disposal System in Uganda. Journal of Public Procurement and Contract Management. Vol. 2, No. 1.

Thai, K.V., (2017). Global Public Procurement Theories & Practices. Cham: Springer Nature.

UN, (2012). Procurement Practitioner’s Handbook. New York: UN Publishers.

World Bank, (2017). World Bank Annual Report 2017. Washington D.C: World Bank.

World Bank, (2016). World Bank Procurement Regulations for IPF Borrowers. Washington D.C: World Bank.

Downloads

Published

2018-10-04

How to Cite

Suero, I. M., & Ng’eny, G. K. (2018). Factors Influencing Performance of Construction Procurement Contracts at Kenya Ports Authority, Mombasa County, Kenya. Journal of Procurement & Supply Chain, 2(1), 65–85. Retrieved from https://stratfordjournal.org/journals/index.php/journal-of-procurement-supply/article/view/189

Issue

Section

Articles